__________________________CHAD BOUDREAUX CAREER SUMMARY I have 16 years
experience in project controls in the oil and gas industry and engineering
field. Responsibilities have
included managing / supervising people, planning, scheduling, estimating, coordinating of task
and events as well as leading meetings to discuss performance of job status, overall progress and
cost impacts. EDUCATION:LOUISIANA
STATE UNIVERSITY, Baton Rouge, LA,
December 2001
Degree: Bachelor of Science
Major: Construction Management OTHERPrimavera
– 3.1, 5.0 & 6.2 Certified, 8.2
version QUALIFICATIONS:MS
Project, MS Word, Excel, Power Point, Skilled in utilizing blueprints, isometrics,
P&ID, and Smart Plant Review for planning &
scheduling of major projects. Skilled in S-Curves & forecasting. Knowledgeable in Cost
Control WORK EXPERIENCES: 2013-2015Chevron Corporation, Covington, LA Sr. Scheduler – P6 vr 8.3 Asset Development
Department – (Engineering) · Work with
Teams consisted of Petroleum Engineers and Geologist to develop a · Maturation
Schedule through Execution of the Well. The basis of the schedule is derived
from · Chevron’s
Project Development & Execution Process (CPDEP) consisting of Five
phases.
Well Intervention and Completions Department (WIC) - Upstream · Development
of schedules for a Well with scope of work ranging from Maintenance on · an
existing well, a New Drill, Sidetrack, Work Over and Completion of the Well.
Integrated Planning and Scheduling Department – Upstream · Daily
Collaboration with other Schedules across multiple departments to integrate
the schedule ·
with logic, resource loading and project / activity coding 2011- 2013JACOBS - Baton Rouge, LA Sr.
Planner/Scheduler – P6.2
Exxonmobil Eagle Retrofit Project ·
Worked in the capacity as lead planner during FEED.
Assisted engineers with constructability
during Model reviews with all disciplines. ·
Performed front-end planning to develop early baseline
schedule. ·
Mobilized to field and developed a construction schedule
working with engineers, Field
planners and General Foremen. ·
Set baseline and maintained EPC schedule with weekly
progress, create look-ahead schedules
for foremen; filters and layouts for upper management’s review Created manpower & progress curves and updated
weekly Exxonmobil
– Refinery & Chemical Plant ·
Assist with Scheduling functions during T/A’s such as
updating, report writing, look-ahead
schedule, critical path analysis, multiple float paths, etc… ·
Report usage of resources and needs, critical path,
percent complete and earned value 2010 – 2011 TURNER INDUSTRIES – Baton Rouge,
LA Supervisor
– Project
Controls
Syngenta Crop Protection Facility ·
Supervisor of Planning/Scheduling Department of 6
employees ·
Oversee that work orders are planned and scheduled for
capital projects, routine maintenance
and turnarounds ·
Coordinate and delegate task to insure that goals are met ·
Facilitate weekly meetings with staff, management and
turnaround team ·
Track and report project status, efficiency, forecast and
develop recovery plan when necessary ·
Review budgets for capital projects ·
Work in multiple software to produce reports and tracking
charts ·
Implement plan for turnaround execution 2010NORCON – Fairbanks, Alaska Sr. Scheduler – Primavera 6.2 Fort Greely Future Power Plant Missile Defense ·
Develop a workable schedule by assigning
predecessors, successors, constraints, milestone, logic
ties, resources, durations for all disciplines. ·
Create look-ahead schedules for foremen; filters and
layouts for upper management’s review ·
Facilitate weekly meetings with project team and
management 2009 – 2010CDI ENGINEERING SOLUTIONS – Baton
Rouge, LA Planner Georgia-Pacific Paper Mill ·
Planned work orders on all automated equipment inside the
facility using proprietary software. ·
Held daily meeting with staff to assign planned work
orders to work crews. ·
Coordinated outside vendors to conduct work inside
facility. 2007 – 2009FLUOR CORPORATION – Houston, TX Lead Planner / Scheduler – Primavera 5.0 Marathon Oil Corporation ·
Responsible for 3 units on grass roots project
- Main Pipe-rack, Flare and Utilities Unit ·
Develop a workable schedule by assigning
predecessors, successors, constraints, milestone, logic
ties, resources, durations for civil, structural, piping and mechanical
disciplines ·
Assist with Scheduling functions during project such as
updating, report writing, look-ahead schedule,
critical path analysis, multiple float paths, etc… ·
Create look-ahead schedules for foremen; filters and
layouts for upper management’s review. ·
Assisted in building and updating progress curves. 2005 – 2007TURNER INDUSTRIES – Baton Rouge,
LA Planner/Scheduler-Primavera 3.1, 5.0 & 6.7 See Active Projects ·
Daily interaction with Refinery Personnel on Logistics
with Plant Shutdown, equipment release, decommissioning,
commissioning; Interaction with Engineering on special equipment needs ·
Develop work scope, plan sequence of events and implement
information into P3 schedule ·
Review original scope, plan detail sequence on all major
equipment ·
Develop a workable schedule by assigning
predecessors, successors, constraints, milestone, logic
ties, resources, durations for mechanical and piping disciplines ·
Assist with Scheduling functions during T/A’s such as
updating, report writing, look-ahead schedule,
critical path analysis, multiple float paths, etc… ·
Knowledge of resource leveling, free float, total float,
critical path analysis, earned value ·
Set baseline schedule- assign cost/expenses for
budget purposes and track actual against budget ·
Create look-ahead schedules for foremen; filters and
layouts for upper management’s review. ·
Daily interaction with Project Team on work progress,
updates on fabrication, procurement of materials,
installation and design procedures, Vessel status, engineering, etc... ·
Managed up 2500 activities 2004 – 2005STOLT OFFSHORE - Houston, Texas Scheduler – Primavera 5.0 ·
Scheduled daily activities for subsea work with 3 project
being located in Trinidad ·
Daily interaction with Project Team on work progress,
updates on fabrication, procurement of materials,
installation and design procedures ·
Weekly progress of schedule and report writing. 2001 – 2004TURNER INDUSTRIES GROUP - Houston,
Texas. Project Planner/Coordinator Rhodia, Inc ·
Supervised nine man crew with concentration on Tank
Inspection and Repair. ·
Perform walk downs, research archives and develop original
scope ·
Develop and maintain schedule - create look ahead for
upcoming tank inspection and repair work ·
Communicate schedule progress to management during weekly
meeting ·
Identify manpower needs, procure materials, define
isolation points ·
Implement plan, coordinate all contractor efforts ·
Conduct day to day productivity monitoring, aids in
securing permits, act as Entry Supervisor for
confine spaces as needed ·
Serves as field construction manager, schedule meetings
and set agendas with necessary personnel,
prepare final reporting outlining project scope/repairs for archiving. ACTIVE PROJECTS:
Chevron Corporation (Upstream Division)
Working with oil wells drilled in
the Gulf of Mexico from engineering through construction phase.
EXXONMOBIL (2011-Present Jacobs) a.
Eagle Retrofit Project – retrofit to produce Mobil One Oil
– Valued at $135m b.
Refinery and Chemical Plant - Capital Projects and Revamps
Baton Rouge, LA SYNGENTA
CROP PROTECTION FACILITY (2011 - Turner) A
multi process facility with a focus on Fungicides, Herbicides, and
Insecticides. Regular
routine maintenance, Capital Projects and Turnaround Outages throughout the
year. St.
Gabriel, LA FORT
GREELY FUTURE POWER PLANT MISSILE DEFENSE (2010
-Norcon)
Construction of a HEMP-shielded permanent power plant / fuel
storage facility which houses
five (5) 12.47kV 1825 kW prime rated diesel engine-generators as a standby
power source.
Valued at $72m. - Ft. Greely, Alaska
GEORGIA-PACIFIC PAPER MILL (2009-2010 – CDI) Routine Maintenance planning in Fine Paper
Converting area. Production of 1500 tons per day of paper products. Port Hudson, LA MARATHON OIL(2007- 2009 – Fluor) Garyville Major Expansion Expansion to the existing refinery to boost crude
oil capacity to 425,000 bpd up from it’s current capacity of 245,000 bpd which is equivalent to adding 7.5
million gallons of clean fuels a day. Valued at 3.2 Billion - Garyville, LA EXXON/MOBIL (2006- 2007 - Turner) Beaumont
Coker Safety Project Mechanical
and Piping Upgrade Installation on Coker Drums for safety of Plant Personnel. TUB
and BUD Installation, Winches, Drill Stems, Cutter Shack, HPU System Valued
at $200m – Beaumont, TX CHEVRON/TEXACO
(2005- 2006 – Turner)) FCC/Alky 1 Reliability and Net Cash Margin
Uplift Project Capital and Maintenance Work for Turnaround
Outage – Replacement of major equipment,
Inspection/Repair for drums, exchangers, columns. Replacement of all
pumps. Demo and Install Piping, Valued at $350m
- Pascagoula, MS STOLT OFFSHORE (2004- 2005)
Trinidad Campaign - "Dolphin Deep" Project
62 miles of 24" pipeline placed on seabed; 5 miles of 12" Flowline
Pipe; Installation of Plem,
Risers, Clamps and J-Tubes.
Valued at $81m - Houston, TX RHODIA, INC (2004 -
Turner) Tank Inspection and
Repair Work (Approximately 40 Acid Storage Tanks) Houston, TX GULF MARINE
FABRICATORS (2004 – Turner) Kerr McGee “Red Hawk”
Project (8k ton Offshore Platform) Aransas Pass, TX 78336 GB BIOSCIENCES
(2003 - Turner)
CTL Venture Phase
2 (New Construction and Maintenance Turnaround) Houston, Texas VALERO REFINING
COMPANY (2003 – Turner) Coker/Gas Plant
(Maintenance/Capital Turnaround) Texas City, Texas MARATHON ASHLAND
PETROLEUM, L.L.C. (2003 - Turner) 2003
Maintenance/Capital Turnaround Texas City, Texas SOFTWARE
SKILLS:Indus Passport, Primavera,
SureTrak, Microsoft Office and Projects, SAP, Smart Model Review SPECIAL
TRAINING:Supervisor Safety and
Hazardous Recognition Training CERTIFICATIONSPrimavera
– 3.1, 5.0 & 6.2 Certified
AACE International Member AND
AFFILIATIONS
Digital Electronics
Certificate
International Honor Society for Const. Mgt. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|